Zoning
- Rezoning
- A rezoning changes the zoning district of a parcel or area. The uses and standards of the new district then apply to the land.
- Zoning variance
- A zoning variance lets one property depart from a standard in the zoning ordinance, such as a setback, height limit or minimum lot size.
- Conditional use permit
- A conditional use permit (CUP) allows a use that a zoning district lists as conditional, on one property, subject to conditions the city or county sets. Some places call it a special use permit or a special exception.
- Upzoning
- Upzoning changes the zoning of land to allow more development than before: more homes, taller buildings or a wider range of uses.
- Land entitlement
- Land entitlement is the process of getting the approvals needed to develop a property for a specific use. The approvals themselves are the entitlements.
- Zoning report
- A zoning report summarizes the zoning of a property: its district, the uses and standards that apply, and whether the existing use and buildings comply.
Permits
- Building permit
- A building permit is approval from a city or county to build, alter, repair or demolish a structure. The work must follow the building code and pass inspection.
- Certificate of occupancy
- A certificate of occupancy (CO) is issued by the building department when a building passes its final inspections. It states that the building can be used for its approved use.
- Electrical permit
- An electrical permit approves electrical work on a building, such as new wiring, a new panel or a service upgrade. A licensed electrician usually applies for it.
- Plumbing permit
- A plumbing permit approves work on a building's water supply, drains, vents or gas piping. A licensed plumber usually applies for it.
- Mechanical permit
- A mechanical permit approves work on heating, ventilation and air conditioning (HVAC) systems. In many places it also covers ductwork, exhaust and fuel-burning equipment.
- Roofing permit
- A roofing permit, or re-roof permit, approves replacing or recovering a roof. Most places require one when all or most of a roof is replaced.
- Solar permit
- A solar permit approves installing solar panels on a roof or on the ground. Most places require a building permit and an electrical permit, and the utility must approve the connection.
- Grading permit
- A grading permit approves moving soil on a site, such as clearing, excavating or filling land. It usually includes an erosion and sediment control plan.
- Right-of-way permit
- A right-of-way permit approves work in a public street, sidewalk or utility corridor, such as a driveway, a utility line or a dumpster on the street. It is also called an encroachment permit.
- Over-the-counter permit
- An over-the-counter permit is issued the same day it is applied for, without plan review. It covers simple, standard work, such as replacing a water heater or an HVAC unit.
- Unpermitted work
- Unpermitted work is construction done without a required permit, or never finished and inspected under one. Common examples are finished basements, decks, additions and bathroom remodels.
Parcels
- Parcel
- A parcel is a piece of land with defined boundaries that is mapped and taxed as one unit.
- Assessor's parcel number (APN)
- An assessor's parcel number (APN) is the identifier a county assessor gives each parcel for mapping and taxation.
- Parcel map
- A parcel map shows the boundaries of the land parcels in an area, each labeled with its parcel number.
- Parcel data
- Parcel data is the set of public records that describe each parcel of land: its boundary, owner, value, use and buildings.
Look up the zoning and records of any property