Work that needs an electrical permit
- New circuits and wiring
- Panel replacements and service upgrades
- Generators and transfer switches
- EV chargers
- Solar panels and batteries
- Pools, hot tubs and other equipment on a dedicated circuit
Replacing a light fixture, switch or outlet with one of the same kind is usually exempt. Exemptions vary by state and city.
Who can apply
Most places require a licensed electrical contractor to apply. Many states also let homeowners apply for work on a home they own and live in, and do the work themselves.
Inspections
A rough-in inspection checks the wiring before the walls are closed, and a final inspection checks the finished work. For a new service, the utility connects power after the inspection passes. Some places issue a temporary or conditional power permit so equipment can run before the final inspection.
Electrical permits in Holly Springs, NC
ElectricalHolly Springs, NC4 permitsExample
| Permit | Work | Issued | Valuation |
|---|---|---|---|
| 2017-00002415-16448 | Town Hall: 30-amp circuit from the generator panel to the server room | 2017-12-20 | $500 |
| 2018-00000845-17475 | Replace a panel and two lights in a chemical room | 2018-05-02 | $4,000 |
| 2019-00001346-20972 | Electrical service | 2019-07-18 | $4,500 |
| PRCP202300393 | Conditional power for a new three-phase service to a commercial building | 2023-02-15 | Not declared |
Frequently asked questions
- Do I need a permit to replace an electrical panel?
- Yes, in nearly every city and county. A panel replacement needs an electrical permit and an inspection, and often a disconnect and reconnect by the utility.
- Can I do my own electrical work?
- Many states allow homeowners to do electrical work on a home they own and live in, with a permit and inspection. Rental and commercial property usually needs a licensed electrician.
- Do I need a permit for an EV charger?
- A Level 2 charger on a new circuit needs an electrical permit in most places. Plugging a charger into an existing outlet usually does not.
Related
- Building permitA building permit is approval from a city or county to build, alter, repair or demolish a structure.
- Solar permitA solar permit approves installing solar panels on a roof or on the ground.
- Mechanical permitA mechanical permit approves work on heating, ventilation and air conditioning (HVAC) systems.
- Over-the-counter permitAn over-the-counter permit is issued the same day it is applied for, without plan review.
- Building permit dataBuilding and trade permits, with status, value and the names on them.
- Property data APIOne REST API for parcels, zoning, permits and decisions.
- Data and researchCounty-wide property records in one format.
Search electrical permits by address
Start free. No credit card required. Contact sales for higher volumes.