Grading permit

A grading permit approves moving soil on a site, such as clearing, excavating or filling land. It usually includes an erosion and sediment control plan.

When a grading permit is required

Most places require one when work moves more than a set volume of soil, disturbs more than a set area or changes drainage. The limits vary widely. Construction that disturbs one acre or more also needs stormwater permit coverage under the federal Clean Water Act.

Process

A civil engineer prepares a grading plan with the existing and proposed contours, drainage, and erosion controls such as silt fence and sediment basins. The city, county or state reviews the plan, and inspectors check the controls while work is underway.

Early and mass grading

On a large project, an early or mass grading permit lets site work start before the building permits are issued. Grading is often the first permit on a site, months before construction.

Grading permits in Holly Springs, NC

GradingHolly Springs, NC4 permitsExample
PermitWorkAppliedStatus
PRGR202102558Mass grading plan for the Amgen site2021-08-30Issued
PRGR202102539Grading for initial site trailers, FUJIFILM2021-08-27Closed
04-2019-20490UNC Rex Community Health Campus, grading only2019-05-10Expired
08-2017-156152018 Market commercial, grading only2017-08-29Expired

Frequently asked questions

What is the difference between a grading permit and a building permit?
A grading permit covers the land: clearing, cut and fill, drainage and erosion control. A building permit covers the structure. A new building on raw land needs both, and grading comes first.
Do I need a grading permit for my yard?
Usually not for small landscaping. Work near a stream, in a floodplain or on a steep slope often needs one at any size.
What is a land disturbance permit?
Another name for a grading permit in many places, often combined with erosion control.