Building permit

A building permit is approval from a city or county to build, alter, repair or demolish a structure. The work must follow the building code and pass inspection.

Work that needs a building permit

Most places require a building permit for a new building, an addition, structural changes and a change in how a building is used. Electrical, plumbing and mechanical work usually needs its own trade permit. Painting, flooring and minor repairs usually need none, but the list of exempt work varies by place.

Process

  • Application: the owner or contractor applies with plans and a description of the work.
  • Plan review: building officials check the plans against the building code, and zoning staff check the use and setbacks.
  • Issue: the permit is issued once the review passes and the fees are paid.
  • Inspections: inspectors check the work at stages, such as footings, framing and the final inspection.
  • Close: the permit is closed after the final inspection. A new building then receives a certificate of occupancy.

Fees and valuation

Most places base the fee on the declared value of the work, called the valuation. Others charge by square foot or a flat fee per trade. Plan review, impact and utility connection fees are often charged separately.

Expiration

A permit usually expires if work does not start within a set period, often 180 days, or stops for that long. Most places grant an extension on request.

The largest building permits in Holly Springs, NC

New non-residential buildingHolly Springs, NCBy valuationExample
PermitWorkIssuedValuation
PRNR202600210Genentech production building2026-03-04$622,476,626
PRNR202202611FUJIFILM drug substance manufacturing building 22022-09-30$364,584,447
PRNR202200502FUJIFILM drug substance manufacturing building 12022-03-30$360,440,119
PRNR202502180Amgen central utility and manufacturing buildings2025-10-17$347,638,331

Frequently asked questions

How long does it take to get a building permit?
A simple residential permit can be issued the same day or within a few weeks. A commercial building with full plan review usually takes one to three months.
What happens if you build without a permit?
The city or county can stop the work, charge a fine and require the work to be opened for inspection or removed. Unpermitted work can also delay a sale.
Are building permits public records?
Yes. Most cities and counties publish them in an online permit portal. Placestack returns them by address, parcel or area.