Work that needs a building permit
Most places require a building permit for a new building, an addition, structural changes and a change in how a building is used. Electrical, plumbing and mechanical work usually needs its own trade permit. Painting, flooring and minor repairs usually need none, but the list of exempt work varies by place.
Process
- Application: the owner or contractor applies with plans and a description of the work.
- Plan review: building officials check the plans against the building code, and zoning staff check the use and setbacks.
- Issue: the permit is issued once the review passes and the fees are paid.
- Inspections: inspectors check the work at stages, such as footings, framing and the final inspection.
- Close: the permit is closed after the final inspection. A new building then receives a certificate of occupancy.
Fees and valuation
Most places base the fee on the declared value of the work, called the valuation. Others charge by square foot or a flat fee per trade. Plan review, impact and utility connection fees are often charged separately.
Expiration
A permit usually expires if work does not start within a set period, often 180 days, or stops for that long. Most places grant an extension on request.
The largest building permits in Holly Springs, NC
New non-residential buildingHolly Springs, NCBy valuationExample
| Permit | Work | Issued | Valuation |
|---|---|---|---|
| PRNR202600210 | Genentech production building | 2026-03-04 | $622,476,626 |
| PRNR202202611 | FUJIFILM drug substance manufacturing building 2 | 2022-09-30 | $364,584,447 |
| PRNR202200502 | FUJIFILM drug substance manufacturing building 1 | 2022-03-30 | $360,440,119 |
| PRNR202502180 | Amgen central utility and manufacturing buildings | 2025-10-17 | $347,638,331 |
Frequently asked questions
- How long does it take to get a building permit?
- A simple residential permit can be issued the same day or within a few weeks. A commercial building with full plan review usually takes one to three months.
- What happens if you build without a permit?
- The city or county can stop the work, charge a fine and require the work to be opened for inspection or removed. Unpermitted work can also delay a sale.
- Are building permits public records?
- Yes. Most cities and counties publish them in an online permit portal. Placestack returns them by address, parcel or area.
Related
- Certificate of occupancyA certificate of occupancy (CO) is issued by the building department when a building passes its final inspections.
- Electrical permitAn electrical permit approves electrical work on a building, such as new wiring, a new panel or a service upgrade.
- Over-the-counter permitAn over-the-counter permit is issued the same day it is applied for, without plan review.
- Unpermitted workUnpermitted work is construction done without a required permit, or never finished and inspected under one.
- Building permit dataBuilding and trade permits, with status, value and the names on them.
- Lending and due diligenceZoning, permits and the property record behind every deal.
- Property data APIOne REST API for parcels, zoning, permits and decisions.
See the permit history of any property
Start free. No credit card required. Contact sales for higher volumes.