Over-the-counter permit

An over-the-counter permit is issued the same day it is applied for, without plan review. It covers simple, standard work, such as replacing a water heater or an HVAC unit.

Work that is often over the counter

  • Water heater and HVAC replacements
  • Re-roofing
  • Electrical service and panel replacements
  • Fences, sheds and small decks
  • Minor interior alterations with no structural change

Each city and county publishes its own list.

Process

The applicant submits the application, and sometimes a simple drawing, at the permit counter or online. Staff check it, collect the fee and issue the permit. The work still has to pass inspection.

Online permits

Many places now issue these permits online, as express, instant or e-permits.

Trade permits issued the day they were filed in Holly Springs, NC

Trade permitsHolly Springs, NC4 permitsExample
PermitWorkAppliedIssued
2017-00002415-16448Town Hall: 30-amp circuit from the generator panel to the server room2017-12-202017-12-20
2018-00000845-17475Replace a panel and two lights in a chemical room2018-05-022018-05-02
2018-00000817-17441Replace a backflow preventer2018-04-272018-04-27
2015-00001958-10917Non-residential HVAC change2015-11-232015-11-23

Frequently asked questions

How long does an over-the-counter permit take?
Usually less than an hour at the counter, or the same day online.
What is the difference between an over-the-counter permit and a plan review permit?
A plan review permit needs building officials to review drawings, which takes days to months. An over-the-counter permit is issued without that review.
Can work start right after an over-the-counter permit is issued?
Yes. The work still has to pass inspection before the permit is closed.

Search permits by address or city

Start free. No credit card required. Contact sales for higher volumes.